Rough figure before a site visit
A contractor gives an indicative price for a bathroom refit, with the caveat that it is not final.
- Scope
- Bathroom refit, labour and materials
- Estimated total
- 78,000
- Note
- Subject to survey
Result. An estimate that reads as approximate rather than binding, which is what keeps it from being treated as a quote.